Optimisation of the assembly area for the efficient & economic production of hydraulic components for Dipl. Ing. K. Dietzel GmbH
Factory planning, Design variants, Capacity planning, Layout, Logistics planning, Material flow, Value stream
Task
Significant reduction in production costs and
Reduction of personnel expenses (due to impending labour shortage)
with constant space requirements
Implementation
Plausibility check by comparing real key figures with key figures from the digital model:
Workplace utilisation
Space requirement
Production costs per product family and on average across all product families
Afterwards:
Identification of the bottleneck
Derive measures
Evaluation of measures according to influence on bottleneck and costs
Customer benefits
Production costs: -10 %
Personnel requirement: -19 %
Area productivity: + 30 %
Material flow expenditure: - 61 %
Downloads
Placeholder link
Arrange a free demo without obligation now.
The 2 steps to your demo licence:
We will get in touch with you as soon as possible for a brief, non-binding initial consultation. This will give us a first impression of your requirements and expectations and enable us to better assess which demo version is right for you.
Immediately afterwards, we will issue you with a 14-day demo licence so that you can get to know the ema Software Suite for yourself.
Tip: Take advantage of a free live demonstration & make it easier for yourself to get started with our free ema Academy